Designing the programme

Schedules, priorities, vendor agreements and the repair-or-replace decision. Most of the avoidable money is lost here rather than in dispatch efficiency.

Programme design

09 documents
  • Building a Preventive Maintenance Schedule

    Procedure

    Start with a dozen assets rather than the whole estate, define the task list rather than the interval, and expect the first version to be wrong.

  • Priorities and Response Times

    Reference

    Without a written scale everything becomes an emergency, emergency rates get paid for routine work, and real emergencies queue behind door handles.

  • Repair or Replace

    Procedure

    The decision is made repeatedly under pressure with no data, and the default is always repair. A threshold set in advance works better.

  • Warranty Tracking That Saves Money

    Procedure

    Operators pay for covered repairs routinely because nobody checks before dispatching. One register field and one process step fix it.

  • Parts: What to Hold and What Not To

    Reference

    Most restaurant operators should hold almost no parts. The exceptions are cheap, small, and prevent expensive downtime — and they are usually not stocked.

  • Choosing and Managing Vendors

    Procedure

    For most operators maintenance is vendor management. Fewer vendors with real agreements beat a long list of numbers.

  • Service Agreements That Are Worth Signing

    Reference

    Most contracts guarantee an arrival rather than working equipment. The clauses that make the difference are specific and usually absent.

  • Rolling a Maintenance Programme Across Sites

    Procedure

    Programmes fail at rollout rather than at design. Sequencing, site manager buy-in and a pilot that is allowed to fail are what separate the two.

  • Budgeting Maintenance

    Analysis

    Budgets set from last year's spend encode last year's neglect. A build from the asset register produces a defensible number.